Church Refurbishment

Taken Sunday Sept 27, 2015.
Taken Sunday Sept 27, 2015.

SINCE last week, Sept 25, the project has been slowed by the discovery of more termite damage than was previously known.

The whole bottom back wall (behind the altar) was compromised. That wall and a small part of the protruding rafter have been rebuilt.

The painting has begun but the plastering was delayed by the need to rebuild the wall. The lighting has been completed though there are still some issues that may require enhanced lighting. Plastering will last several days.

On the whole, it is going well.